Training Migas - Oil and Gas

Archive for December, 2014

OIL AND GAS LAW OF CONTRACT
By December 29, 2014 0 Comments Read More →

OIL AND GAS LAW OF CONTRACT

OIL AND GAS LAW OF CONTRACT Yogyakarta | 27 – 29 Januari 2015 | IDR 6.500.000,- Yogyakarta | 24 – 26 Februari 2015 | IDR 6.500.000,- Yogyakarta | 24 – 26 Maret 2015 | IDR 6.500.000,- Yogyakarta | 28 – 20 April 2015 | IDR 6.500.000,- DESKRIPSI Adanya sebuah kontrak adalah sebagai kekuatan hukum yang […]

GAS DEHYDRATION AND GLYCOL REGENERATION
By December 22, 2014 0 Comments Read More →

GAS DEHYDRATION AND GLYCOL REGENERATION

GAS DEHYDRATION AND GLYCOL REGENERATION Bandung | April 06 ‐ 09, 2015 | Rp. 9.900.000,-/participant   Course Description and Benefits condense in pipelines and accumulate at low points along the line, reducing its flow capacity. Therefore, the removal of the water that is associated with natural gases in vapor form is one critical step in gas processing […]

Onshore and Offshore Oil & Gas Production Operation
By December 22, 2014 0 Comments Read More →

Onshore and Offshore Oil & Gas Production Operation

Practical Knowledge of Onshore and Offshore Oil & Gas Production Operation for Non-Technical Person Bandung | December 21 – 23, 2015 | Fee at Proposal This course is designed to provide a practical and easy-to-understand description and basic knowledge of oil and gas surface production operations and the technical-related aspects commonly used in daily work activities […]

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING
By December 22, 2014 0 Comments Read More →

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING

WELL OPTIMIZATION ARTIFICIAL LIFT, GAS LIFT, WELL OPTIMIZATION, TROUBLESHOOTING Batam | April 15 – 17, 2015 | Rp 8.900.000   COURSE OUTLINE Oil Field Production System Natural Production Systems Production System With Artificial Lift Gas Lift (GL) Introduction Continue and Intermittent Gas Lift Main Gas Lift Equipment Parts IPR and Designing Gas Lift Optimization and Allocation […]

Well Logging Analysis and Interpretation
By December 19, 2014 0 Comments Read More →

Well Logging Analysis and Interpretation

Well Logging Analysis and Interpretation Yogyakarta | March 30 – April 01, 2015 | Rp 9.900.000 Course Objectives Logs are the most universal technical documents on oil and gas wells. They impact the work of almost every oilfield group from geologist to drillers to banker. Familiarity with the purpose and applications of well logs is therefore essential. […]

NATURAL GAS PLANT KNOWLEDGE
By December 18, 2014 0 Comments Read More →

NATURAL GAS PLANT KNOWLEDGE

NATURAL GAS PLANT KNOWLEDGE Bogor | May 25 – 28, 2015  | Rp. 10.500.000,-/participant     COURSE CONTENT   The reservoir of Natural Gas. Exploration and drilling.  Well casing and completion.  Gas well and wellheads. Gas lift, workover and stimulation. Natural gas specification.  Gas processing and the principal gas products. Production, separation and testing. Gas […]

INTEGRATED PROJECT MANAGEMENT FOR OIL AND GAS
By December 18, 2014 0 Comments Read More →

INTEGRATED PROJECT MANAGEMENT FOR OIL AND GAS

INTEGRATED PROJECT MANAGEMENT FOR OIL AND GAS Bandung | May 05 – 07, 2015 | Rp. 8.900.000.00/person     Course Information Integrated Project Management is a comprehensive course for project management and engineering professionals desiring to expand their general knowledge of Project Management. Integrated Project Management provides professionals from various industries on future trends as well as implementation of […]

Dew Point Control System Operation & Maintenance
By December 18, 2014 0 Comments Read More →

Dew Point Control System Operation & Maintenance

Dew Point Control System Operation & Maintenance Bandung | November 23 – 26, 2015 | Keterangan Harga di Proposal     Dew point is defined as the temperature at which vapor begins to condense. By managing hydrocarbon dew point, hydrocarbon condensation can be prevented in cold spots under rivers and lakes where the liquids collect […]

Posted in: Bandung, Chemical
Gas Production Optimization In Gas Reservoir
By December 15, 2014 0 Comments Read More →

Gas Production Optimization In Gas Reservoir

Gas Production Optimization In Gas Reservoir Yogyakarta | 22 – 23 Desember 2014 | Rp. 6.000.000 Per Peserta Semarang / Solo | 22 – 23 Desember 2014 | Rp. 7.250.000 Per Peserta Bandung / Jakarta / Surabaya | 22 – 23 Desember 2014 | Rp. 8.500.000 Per Peserta Bali / Batam /Balikpapan / Manado / […]

OIL AND GAS SURFACE FACILITIES
By December 8, 2014 0 Comments Read More →

OIL AND GAS SURFACE FACILITIES

OIL AND GAS SURFACE FACILITIES Hotel Ibis Malioboro, Yogyakarta |  10 – 12 Desember 2014 | IDR  6.500.000 Hotel Ibis Malioboro, Yogyakarta |  15 – 17 Desember 2014 | IDR   6.500.000  Hotel Ibis Malioboro, Yogyakarta |  22 – 24 Desember 2014 | IDR  6.500.000 Hotel Ibis Malioboro, Yogyakarta | 29 – 31 Desember 2014 | IDR   6.500.000    OBJECTIVES Understand the basic concept of oil and gas handling with surface processes […]